Unified Process

Unified process (UP) is a system process engineering metamodel-compliant architecture-centric, use-case oriented, iterative, and incremental development process that uses the suitable modeling language (Techopedia Inc, 2021). Across contexts and organizational traditions, the appropriate method can be extended to various software systems of varying degrees of technological and managerial sophistication (Techopedia Inc, 2021).

Unified Process (UP) is a framework for UML. In software engineering, the UML includes a single process UP. Unified process (UP) is a system process engineering metamodel-compliant architecture-centric, use-case oriented, iterative, and incremental development process that uses the suitable modeling language. The UP can use for various software systems with varying degrees of technological and managerial sophistication. The appropriate software development process is another name for the correct process. With the UP, you can configure the system for specific projects. Business modeling, research, design, implementation, testing, and deployment are all part of the unified process’s four growth phases. The stages are as follows:
• Inception: This step provides an overview of the project’s scope and a high-level understanding of system architecture and specifications. I am also convincing stakeholders to support or oppose the project (Pearson Education, 2001).
• Elaboration: Defining project costs and establishing project schedules for status and projected completions by minimizing risk. This step introduces the development of system architecture design, implementation, testing, and baseline. At this stage, any potential hazards will be detected and analyzed to determine if they can eliminate from the project (Pearson Education, 2001).
• Construction: The software architecture progresses from building to the operating environment (release). The first models are intended to be used as research environments. The method moves on to the next step after the knowledge has been checked and validated to function correctly (Pearson Education, 2001).
• Transition: Ensure that the program meets the needs of the end-users by thoroughly testing it before delivering it to them. Minor changes need to be made after the release if bugs are discovered. The primary focus of user reviews will be on corrections, fine-tuning, configuring, updating, and other problems (Pearson Education, 2001).

Do you need urgent help with this or a similar assignment? We got you. Simply place your order and leave the rest to our experts.

Order Now

Quality Guaranteed!

Written From Scratch.

We Keep Time!

Scroll to Top